Global Freight Forwarding Photo Gallery

  1. Barge delivery of boilers on Welland Canal, Canada, as too large to transport via road.

    Dims: 15.5 x 6.1 x 6.4 M (lwh), 131,540 kg each
    Boilers
  2. 2 x heavy-lift transformers for power dam project in Malaysia via roll on/off operation on river barge, enroute to final site.

    Dims: 12.5 x 3.9 x 4.2 M (lwh), 240,000 kg each
    Power Dam
  3. Transport of large volume of wind tower sections via barge from Milwaukee, WI, to Oswego, NY, for wind farm construction project.

    Wind Tower
  4. Ocean charter from Japan steel mill and final rail delivery to Oilsands location near Fort McMurray, AB, Canada.

    200 railcars of large over dimensional (28" - 42") steel pipe.
    Oilsands
  5. 4 x Power Transformers from Austria to pad at final site in Ontario, Canada.

    Dims: 5.1m x 3.4m x 4.6m (lwh) x 112,000 kgs each
    Power Transformers
  6. 4 x Power Transformer from Austria delivered to final pad at site via jack & roll operation in Ontario, Canada.

    Dims: 5.1 x 3.4 x 4.6 M (lwh), 112,000 kg each
    Power Transformers
  7. Refinery module being delivered to site in Malaysia. Required dual lane Self Propelled Modular Trainer (SPMT).

    Dims: 12.2 x 6.7 x 5.5 M (lwh), 136,000 kg
    Refinery Module
  8. Full ocean charters of turbines and towers shipped from Europe, South America and Asia to North American ports for final delivery to sites.

    Wind Turbines
  9. Complex truck delivery of 42.5m (140 ft) blade for Windfarm construction project in PEI, Canada.

    Windfarm
  10. Shipment of mobile cranes via ocean liner service from Dubai to Africa.

    Mobile Cranes
  11. Jack Up Rig shipped via DOCKWISE semi-submersible vessel shipped from Malaysia to Abu Dhabi, UAE.

    Dims: Approximately 5200 MT
    Jack-Up Rig
  12. Loading gas plant modules to charter vessel via floating crane in Houston, TX.

    Gas Plant Modules
  13. Refinery components from Canada, USA and UK to Pyt-Yakh, Russia. Delivery to site by rail via St. Petersburg.

    Volume: 88 x break-bulk pieces including 40m long tower (5623.35 CBM, 734,249 kg), 100 x 40' Containers
    Refinery
  14. Remote site delivery from global suppliers for EPCM gold mine construction project in Mexico. Full route survey and specialized carrier analysis was required.

    Volume: 120 truckloads, 11,000 CBM
    Gold Mine
  15. Final delivery to gas plant construction project in Oman. Compression skids, coolers skids and parts from Canada. Volume: 2,700 CBM

    Dims: Coolers > 17.7x5.2x4.6 M (lwh), 43,000 kg ea.; Compressors @ 13.4x4.4x3.9 M (lwh), 59,600 kg ea.
    Gas Plant
  16. Pipe charters shipped from mills in Japan and China for final delivery to Canadian Oilsands projects in Fort McMurray, AB, Canada.

    Oilsands
  17. Project coordination and transport of dismantled Canadian oil refinery shipped from Alberta, Canada to Novorossiysk, Russia.

    Volume: Approximately 25,000 freight tons + 200 containers
    Oil Refinery
  18. Transport of 2 x cranes for offshore drilling platform. Shipped from factory in Onsan, South Korea, via SPMT trailer, vessel charter to Rotterdam, Netherlands.

    Dims: 36.0 x 8.0 x 13.5 M (lwh), 150 MT each
    Cranes
  19. Specialized transport of legs for Jack-Up rigs from Dubai to Malaysia.

    Jack-Up Rigs
  20. Mill Shell segments from Spain to British Columbia, Canada, for EPCM mining construction project.

    Dims: 10.0 x 5.4 x 3.1 M (lwh), 55,475 kg each
  21. Mining trucks being delivered to site for construction project in the Middle East. Origin: Fujairah, UAE - Destination: Adana, Turkey

    Total Volume: 1,179.20 FT, 11.0 x 3.35 x 4.0 M (lwh), 31 tons each
    Mining Trucks
  22. Oil Refinery Modules loading via ocean charter from Europe for final delivery in USA by barge to refinery.

    Oil Refinery
  23. Nacelle for wind farm delivered to Canadian site by truck with extra tractors required due to steep road grades enroute.

    Wind Farm
  24. 2 x Boilers from Illinois, USA, to Fort McMurray, AB, Canada. Delivered by Special Train routing due to height and width.

    Dims: 14.9 x 3.9 x 5.2 M (lwh), 117,934 kg each
    Boilers
  25. Helicopter shipped via air charter from Cairo, Egypt to Abu Dhabi, UAE.

    Helicopter
  26. 2 x AN124 charters from Ontario to Australia for emergency delivery of turbines to mine site to restore power lost to drag-line due to flooding damage.

    Dims: 13.5 x 2.6 x 3.0 M (lwh), 89 MT each
    Turbines
  27. Urgent delivery of mining equipment via AN124 charter from Florida to Kyrgyzstan.

    Mining Equipment